BART to Silicon Valley

FMG’s focus for BART to Silicon Valley Phase 2 is as architectural designer for the Diridon Station. Designers are utilizing BIM360 for the vent structures and adjacent transit-oriented developments in downtown San Jose. The FMG team is responsible for designing all ancillary spaces for the underground station and vent structures. This effort coordinates with the prime engineering and architecture team for seamless design integration while keeping a continuous interface with technical leads for structures, tunnels, systems, and mechanical engineers to provide space-proofing for all utilities.

During Phase 1, FMG completed the concept plan to accommodate future intermodal transportation at the Alum Rock and Berryessa Stations. The initial phase of the project addressed track configuration, access to and from the station through various transportation options, and integration of the surrounding area.

No Comments Yet.

Leave a comment

You must be Logged in to post a comment.